USCIS processing times
USCIS publishes, for each form, case type and office, the time within which 80% of recently completed cases were decided. It once published a range with a median; since 2022 there is one headline figure, and a slower one behind the scenes (roughly the 93rd percentile) that sets the date after which you may file a case inquiry. So a figure of 12 months means four cases in five finished inside a year and one in five took longer. The figures are refreshed monthly and describe the recent past, not your file: a case with a request for evidence, a missed biometrics appointment or a background check runs on its own clock.
How long will my case take
I-485, family-based adjustment applications, at New York City NY. Figure published for Aug 2026.
USCIS counts a case as outside normal processing after 33.5 months.
Enter the receipt date for an estimated decision window and whether an inquiry can be filed today.
The slowest queues
- I-130
- I-130
- I-130
- I-130
- I-130
Every published figure
| I-90 | 10-year renewal | Service Center Operations (SCOPS) | 10.5 months | 1 Sep 2025 |
| I-90 | Initial issuance or replacement | Service Center Operations (SCOPS) | 6 months | 19 Dec 2025 |
| I-102 | Initial issuance or replacement of a Form I-94 | National Benefits Center | 18.5 months | 13 Oct 2024 |
| I-102 | Initial issuance or replacement of a Form I-94 | Service Center Operations (SCOPS) | 18.5 months | 13 Oct 2024 |
| I-129 | E - Treaty traders and investors | Service Center Operations (SCOPS) | 20 months | 16 Nov 2024 |
| I-129 | E3 - Specialty occupation workers from Australia | Service Center Operations (SCOPS) | 5 months | 14 Feb 2026 |
| I-129 | H-1B - Specialty occupation - Change of status in the U.S. | Service Center Operations (SCOPS) | 10 months | 11 Oct 2025 |
| I-129 | H-1B - Specialty occupation - Extension of stay in the U.S. | Service Center Operations (SCOPS) | 11.5 months | 18 Sep 2025 |
| I-129 | H-1B - Specialty occupation - Visa to be issued abroad | Service Center Operations (SCOPS) | 11 months | 24 Aug 2025 |
| I-129 | H-2A - Temporary agricultural workers - Named Beneficiary | Service Center Operations (SCOPS) | 2 months | 23 May 2026 |
| I-129 | H-2A - Temporary agricultural workers - Unnamed Beneficiary | Service Center Operations (SCOPS) | 2 weeks | 23 May 2026 |
| I-129 | H-2B - Temporary nonagricultural workers | Service Center Operations (SCOPS) | 4 months | 1 Feb 2026 |
| I-129 | H-3 - Temporary trainees | Service Center Operations (SCOPS) | 17 months | 9 Feb 2025 |
| I-129 | Intracompany transferees and blanket L | Service Center Operations (SCOPS) | 6.5 months | 7 Nov 2025 |
| I-129 | O - Extraordinary ability | Service Center Operations (SCOPS) | 14.5 months | 11 Apr 2025 |
| I-129 | P - Athletes, artists, and entertainers | Service Center Operations (SCOPS) | 13 months | 30 Jun 2025 |
| I-129 | Q - Cultural exchange visitors | Service Center Operations (SCOPS) | 7 months | 8 Feb 2025 |
| I-129 | R - Religious occupation | Service Center Operations (SCOPS) | 9.5 months | 23 Sep 2025 |
| I-129 | TN - United States-Mexico-Canada Agreement (USMCA, formerly NAFTA) professional | Service Center Operations (SCOPS) | 4.5 months | 20 Feb 2026 |
| I-129CW | CW-1 - CNMI-Only Nonimmigrant Transitional Worker | Service Center Operations (SCOPS) | 7 months | 23 Oct 2025 |
| I-129F | K1/K2/K3/K4 - Fiance(e) or spouse and/or dependent children | Service Center Operations (SCOPS) | 13 months | 12 May 2025 |
| I-130 | Permanent resident filing for a spouse or child under 21 | All Field Offices | 139 months | 22 Sep 2001 |
| I-130 | Permanent resident filing for a spouse or child under 21 | National Benefits Center | 52 months | 16 Jan 2022 |
| I-130 | Permanent resident filing for a spouse or child under 21 | Service Center Operations (SCOPS) | 45.5 months | 18 Aug 2022 |
| I-130 | Permanent resident for unmarried son or daughter 21 or older | All Field Offices | 188.5 months | 8 Jun 1998 |
| I-130 | Permanent resident for unmarried son or daughter 21 or older | National Benefits Center | 53.5 months | 1 Feb 2022 |
| I-130 | Permanent resident for unmarried son or daughter 21 or older | Service Center Operations (SCOPS) | 52.5 months | 31 May 2020 |
| I-130 | U.S. citizen filing for a brother or sister | All Field Offices | 286.5 months | 24 Mar 2001 |
| I-130 | U.S. citizen filing for a brother or sister | National Benefits Center | 57 months | 18 Mar 2021 |
| I-130 | U.S. citizen filing for a brother or sister | Service Center Operations (SCOPS) | 174.5 months | 3 Jan 2012 |
| I-130 | U.S. citizen filing for a married son or daughter | All Field Offices | 110.5 months | 5 Jul 2013 |
| I-130 | U.S. citizen filing for a married son or daughter | National Benefits Center | 53.5 months | 21 May 2021 |
| I-130 | U.S. citizen filing for a married son or daughter | Service Center Operations (SCOPS) | 121 months | 25 Feb 2014 |
| I-130 | U.S. citizen filing for a spouse, parent, or child under 21 | All Field Offices | 83.5 months | 26 Apr 2017 |
| I-130 | U.S. citizen filing for a spouse, parent, or child under 21 | National Benefits Center | 53 months | 5 Dec 2021 |
| I-130 | U.S. citizen filing for a spouse, parent, or child under 21 | Service Center Operations (SCOPS) | 25.5 months | 30 Nov 2023 |
| I-130 | U.S. citizen filing for unmarried son/daughter 21 or older | All Field Offices | 195 months | 7 Jun 2004 |
| I-130 | U.S. citizen filing for unmarried son/daughter 21 or older | National Benefits Center | 52.5 months | 18 Feb 2022 |
| I-130 | U.S. citizen filing for unmarried son/daughter 21 or older | Service Center Operations (SCOPS) | 96.5 months | 19 Aug 2017 |
| I-131 | Advance parole | Service Center Operations (SCOPS) | 26.5 months | 2 Dec 2023 |
| I-131 | Re-entry permit or refugee travel document | Service Center Operations (SCOPS) | 16.5 months | 16 Dec 2024 |
| I-140 | Advanced degree or exceptional ability (E21) | Service Center Operations (SCOPS) | 3 months | 9 Mar 2026 |
| I-140 | Advanced degree or exceptional ability requesting a National Interest Waiver (NIW) | Service Center Operations (SCOPS) | 30 months | 29 Dec 2023 |
| I-140 | Extraordinary ability (E11) | Service Center Operations (SCOPS) | 32.5 months | 15 Oct 2023 |
| I-140 | Multinational executive or manager (E13) | Service Center Operations (SCOPS) | 27.5 months | 9 Apr 2024 |
| I-140 | Outstanding professor or researcher (E12) | Service Center Operations (SCOPS) | 15 months | 18 Mar 2025 |
| I-140 | Schedule A Nurses | Service Center Operations (SCOPS) | 25.5 months | 9 Jul 2024 |
| I-140 | Skilled worker or professional (E31; E32) | Service Center Operations (SCOPS) | 4 months | 30 Jan 2026 |
| I-140 | Unskilled worker (EW3) | Service Center Operations (SCOPS) | 9 months | 28 Jun 2025 |
| I-212 | Permission to reapply for admission after deportation and removal | All Field Offices | 46 months | 22 Jul 2021 |
| I-212 | Permission to reapply for admission after deportation and removal | Service Center Operations (SCOPS) | 43 months | 22 May 2022 |
| I-360 | Afghan or Iraqi Translators and Afghan or Iraqi nationals who worked for on or behalf of the U.S. government | Service Center Operations (SCOPS) | 14.5 months | 24 May 2025 |
| I-360 | All other special immigrants | Service Center Operations (SCOPS) | 19.5 months | 9 Jan 2024 |
| I-360 | Religious workers | Service Center Operations (SCOPS) | 13 months | 13 Apr 2025 |
| I-360 | Violence Against Women Act (VAWA) | Service Center Operations (SCOPS) | 52.5 months | 6 Nov 2021 |
| I-407 | Record of Abandonment of Lawful Permanent Resident Status | Eastern Forms Center | 2 months | 17 Jul 2026 |
| I-485 | Based on an approved T Visa | Service Center Operations (SCOPS) | 43.5 months | 7 Oct 2022 |
| I-485 | Based on an approved U Visa | Service Center Operations (SCOPS) | 25 months | 30 May 2024 |
| I-485 | Based on grant of asylum more than 1 year ago | All Field Offices | 34.5 months | 9 Feb 2023 |
| I-485 | Based on refugee admission more than 1 year ago | All Field Offices | 30 months | 30 Sep 2021 |
| I-485 | Employment-based adjustment applications | All Field Offices | 9.5 months | 2 Mar 2025 |
| I-485 | Employment-based adjustment applications | Service Center Operations (SCOPS) | 42.5 months | 8 Sep 2022 |
| I-485 | Family-based adjustment applications | Agana GU | 21.5 months | 26 Jul 2023 |
| I-485 | Family-based adjustment applications | Albany NY | 15 months | 7 Jul 2024 |
| I-485 | Family-based adjustment applications | Albuquerque NM | 13.5 months | 23 May 2024 |
| I-485 | Family-based adjustment applications | Anchorage AK | 9.5 months | 14 Apr 2024 |
| I-485 | Family-based adjustment applications | Atlanta GA | 16.5 months | 28 Feb 2024 |
| I-485 | Family-based adjustment applications | Baltimore MD | 19 months | 6 Jan 2024 |
| I-485 | Family-based adjustment applications | Boise ID | 18 months | 8 Aug 2023 |
| I-485 | Family-based adjustment applications | Boston MA | 13.5 months | 21 May 2024 |
| I-485 | Family-based adjustment applications | Brooklyn NY | 19 months | 29 May 2023 |
| I-485 | Family-based adjustment applications | Buffalo NY | 10 months | 13 Apr 2025 |
| I-485 | Family-based adjustment applications | Burlington VT | 8.5 months | 6 Sep 2025 |
| I-485 | Family-based adjustment applications | Charleston SC | 13.5 months | 5 Dec 2024 |
| I-485 | Family-based adjustment applications | Charlotte Amalie VI | 13.5 months | 9 Apr 2023 |
| I-485 | Family-based adjustment applications | Charlotte NC | 18 months | 22 Feb 2024 |
| I-485 | Family-based adjustment applications | Chicago IL | 18.5 months | 19 May 2023 |
| I-485 | Family-based adjustment applications | Christiansted VI | 18 months | 15 Aug 2023 |
| I-485 | Family-based adjustment applications | Cincinnati OH | 14 months | 29 Aug 2024 |
| I-485 | Family-based adjustment applications | Cleveland OH | 15.5 months | 12 Mar 2024 |
| I-485 | Family-based adjustment applications | Columbus OH | 14 months | 21 Oct 2023 |
| I-485 | Family-based adjustment applications | Cranbury NJ | 17 months | 14 Nov 2023 |
| I-485 | Family-based adjustment applications | Dallas TX | 13.5 months | 30 Apr 2024 |
| I-485 | Family-based adjustment applications | Denver CO | 22.5 months | 13 Jun 2023 |
| I-485 | Family-based adjustment applications | Des Moines IA | 14.5 months | 18 Nov 2024 |
| I-485 | Family-based adjustment applications | Detroit MI | 14.5 months | 15 Nov 2023 |
| I-485 | Family-based adjustment applications | El Paso TX | 12.5 months | 12 Nov 2024 |
| I-485 | Family-based adjustment applications | Fort Myers FL | 20 months | 16 Apr 2024 |
| I-485 | Family-based adjustment applications | Fort Smith AR | 15 months | 24 Dec 2024 |
| I-485 | Family-based adjustment applications | Fresno CA | 16 months | 14 Aug 2023 |
| I-485 | Family-based adjustment applications | Greer SC | 15 months | 11 Jan 2025 |
| I-485 | Family-based adjustment applications | Harlingen TX | 11 months | 21 Oct 2024 |
| I-485 | Family-based adjustment applications | Hartford CT | 14.5 months | 7 Feb 2024 |
| I-485 | Family-based adjustment applications | Helena MT | 9.5 months | 6 Jul 2025 |
| I-485 | Family-based adjustment applications | Hialeah FL | 14 months | 10 Jun 2024 |
| I-485 | Family-based adjustment applications | Honolulu HI | 18.5 months | 13 Aug 2023 |
| I-485 | Family-based adjustment applications | Houston TX | 18 months | 4 Oct 2023 |
| I-485 | Family-based adjustment applications | Imperial CA | 12.5 months | 22 Dec 2023 |
| I-485 | Family-based adjustment applications | Indianapolis IN | 22 months | 28 Oct 2023 |
| I-485 | Family-based adjustment applications | Jacksonville FL | 17 months | 14 Jan 2024 |
| I-485 | Family-based adjustment applications | Kansas City MO | 14 months | 5 Jul 2024 |
| I-485 | Family-based adjustment applications | Kendall FL | 14.5 months | 3 May 2024 |
| I-485 | Family-based adjustment applications | Las Vegas NV | 19 months | 6 Oct 2023 |
| I-485 | Family-based adjustment applications | Lawrence MA | 20.5 months | 9 Jun 2023 |
| I-485 | Family-based adjustment applications | Long Island NY | 16.5 months | 23 Dec 2023 |
| I-485 | Family-based adjustment applications | Los Angeles CA | 15 months | 5 Sep 2023 |
| I-485 | Family-based adjustment applications | Los Angeles County CA | 17.5 months | 11 Jul 2023 |
| I-485 | Family-based adjustment applications | Louisville KY | 12.5 months | 8 Sep 2024 |
| I-485 | Family-based adjustment applications | Manchester NH | 13 months | 6 Dec 2024 |
| I-485 | Family-based adjustment applications | Memphis TN | 22.5 months | 2 Jan 2024 |
| I-485 | Family-based adjustment applications | Miami FL | 21.5 months | 23 May 2023 |
| I-485 | Family-based adjustment applications | Milwaukee WI | 15.5 months | 6 Jan 2024 |
| I-485 | Family-based adjustment applications | Minneapolis-St. Paul MN | 16.5 months | 19 Nov 2023 |
| I-485 | Family-based adjustment applications | Montgomery AL | 13.5 months | 11 Dec 2024 |
| I-485 | Family-based adjustment applications | Mount Laurel NJ | 21.5 months | 18 Dec 2023 |
| I-485 | Family-based adjustment applications | Nashville TN | 13.5 months | 12 Oct 2024 |
| I-485 | Family-based adjustment applications | New Orleans LA | 21 months | 10 Sep 2023 |
| I-485 | Family-based adjustment applications | New York City NY | 14.5 months | 19 Dec 2023 |
| I-485 | Family-based adjustment applications | Newark NJ | 22 months | 6 Aug 2023 |
| I-485 | Family-based adjustment applications | Norfolk VA | 19.5 months | 5 May 2023 |
| I-485 | Family-based adjustment applications | Oakland Park FL | 22.5 months | 24 Jun 2023 |
| I-485 | Family-based adjustment applications | Oklahoma City OK | 20.5 months | 1 Jul 2023 |
| I-485 | Family-based adjustment applications | Omaha NE | 12 months | 21 Dec 2024 |
| I-485 | Family-based adjustment applications | Orlando FL | 18.5 months | 3 Jan 2024 |
| I-485 | Family-based adjustment applications | Philadelphia PA | 15 months | 28 Feb 2024 |
| I-485 | Family-based adjustment applications | Phoenix AZ | 14 months | 12 Sep 2024 |
| I-485 | Family-based adjustment applications | Pittsburgh PA | 14 months | 27 Jun 2024 |
| I-485 | Family-based adjustment applications | Portland ME | 22.5 months | 13 Sep 2023 |
| I-485 | Family-based adjustment applications | Portland OR | 16 months | 1 Sep 2023 |
| I-485 | Family-based adjustment applications | Providence RI | 12.5 months | 1 Jan 2025 |
| I-485 | Family-based adjustment applications | Queens NY | 21 months | 11 May 2023 |
| I-485 | Family-based adjustment applications | Raleigh NC | 24.5 months | 31 May 2023 |
| I-485 | Family-based adjustment applications | Reno NV | 18 months | 15 Sep 2023 |
| I-485 | Family-based adjustment applications | Sacramento CA | 18 months | 3 Jul 2023 |
| I-485 | Family-based adjustment applications | Saint Louis MO | 12 months | 26 Aug 2024 |
| I-485 | Family-based adjustment applications | Salt Lake City UT | 15 months | 12 Dec 2024 |
| I-485 | Family-based adjustment applications | San Antonio TX | 13 months | 16 Sep 2024 |
| I-485 | Family-based adjustment applications | San Bernardino CA | 19 months | 1 Jan 2024 |
| I-485 | Family-based adjustment applications | San Diego CA | 13 months | 19 Feb 2024 |
| I-485 | Family-based adjustment applications | San Fernando Valley CA | 13 months | 16 Jul 2023 |
| I-485 | Family-based adjustment applications | San Francisco CA | 18.5 months | 9 Apr 2023 |
| I-485 | Family-based adjustment applications | San Jose CA | 32.5 months | 25 Feb 2023 |
| I-485 | Family-based adjustment applications | San Juan PR | 14.5 months | 3 Apr 2024 |
| I-485 | Family-based adjustment applications | Santa Ana CA | 27.5 months | 7 Feb 2023 |
| I-485 | Family-based adjustment applications | Seattle WA | 36 months | 10 Jan 2022 |
| I-485 | Family-based adjustment applications | Spokane WA | 22 months | 14 Sep 2021 |
| I-485 | Family-based adjustment applications | Tampa FL | 17 months | 13 Jul 2024 |
| I-485 | Family-based adjustment applications | Tucson AZ | 8.5 months | 10 Aug 2025 |
| I-485 | Family-based adjustment applications | Washington DC | 18 months | 27 Sep 2024 |
| I-485 | Family-based adjustment applications | West Palm Beach FL | 16.5 months | 23 Apr 2024 |
| I-485 | Family-based adjustment applications | Wichita KS | 11.5 months | 19 May 2024 |
| I-485 | Family-based adjustment applications | Yakima WA | 21 months | 21 Dec 2021 |
| I-485 | Under the Haitian Refugee Immigrant Fairness Act (HRIFA) | Service Center Operations (SCOPS) | 68 months | 22 Dec 2014 |
| I-526 | Immigrant Petition by Standalone Investor | Immigrant Investor Program Office | 36.5 months | 20 May 2023 |
| I-526(L) | All other areas - For use by an investor who wishes to immigrate to the United States | Immigrant Investor Program Office | 89.5 months | 3 Jan 2018 |
| I-526(L) | China - mainland born - For use by an investor who wishes to immigrate to the United States | Immigrant Investor Program Office | 116.5 months | 7 Mar 2016 |
| I-526E | Immigrant Petition by Regional Center Investor | Immigrant Investor Program Office | 35 months | 21 Jul 2023 |
| I-539 | All other change of status applications | National Benefits Center | 1 week | 7 Jul 2026 |
| I-539 | All other change of status applications | Service Center Operations (SCOPS) | 14 months | 2 Jun 2025 |
| I-539 | All other extension of stay applications | National Benefits Center | 3 weeks | 7 Jul 2026 |
| I-539 | All other extension of stay applications | Service Center Operations (SCOPS) | 11 months | 16 Jun 2025 |
| I-539 | Change of status to B nonimmigrant | Service Center Operations (SCOPS) | 8 months | 21 Dec 2025 |
| I-539 | Change of status to F or M student or J exchange visitor category | Service Center Operations (SCOPS) | 8.5 months | 21 Nov 2025 |
| I-539 | Change of status to H4 dependent with I-765 | Service Center Operations (SCOPS) | 7.5 months | 13 Dec 2025 |
| I-539 | Change of status to H4 dependents | Service Center Operations (SCOPS) | 10.5 months | 2 Aug 2025 |
| I-539 | Change of status to L dependent | Service Center Operations (SCOPS) | 14.5 months | 31 May 2025 |
| I-539 | Extension of stay for B nonimmigrant | Service Center Operations (SCOPS) | 8.5 months | 5 Dec 2025 |
| I-539 | Extension of stay for F or M students and J exchange visitor category | Service Center Operations (SCOPS) | 6.5 months | 27 Jan 2026 |
| I-539 | Extension of stay for H4 dependents | Service Center Operations (SCOPS) | 10.5 months | 15 Aug 2025 |
| I-539 | Extension of stay for H4 dependents with I-765 | Service Center Operations (SCOPS) | 5 months | 29 Dec 2025 |
| I-539 | Extension of stay for L dependents | Service Center Operations (SCOPS) | 8.5 months | 25 Sep 2025 |
| I-539 | Extension of stay for T nonimmigrant | Service Center Operations (SCOPS) | 22 months | 18 Aug 2024 |
| I-539 | Extension of stay for U nonimmigrant | Service Center Operations (SCOPS) | 20.5 months | 2 Nov 2024 |
| I-539 | Reinstatement to student status | Service Center Operations (SCOPS) | 15 months | 16 Apr 2025 |
| I-600 | U.S. citizen filing to adopt an orphan | National Benefits Center | 28 months | 25 Nov 2023 |
| I-600A | U.S. citizen who plans to adopt a foreign-born child | National Benefits Center | 9 months | 8 Sep 2025 |
| I-600A3 | Request for Action on Approved Form I-600A/I-600 | National Benefits Center | 6 months | 28 Jan 2026 |
| I-601 | Waiver of Grounds of Inadmissibility | All Field Offices | 26.5 months | 15 Mar 2022 |
| I-601 | Waiver of Grounds of Inadmissibility | Service Center Operations (SCOPS) | 41.5 months | 26 Nov 2022 |
| I-601A | Provisional Waiver of Unlawful Presence | Service Center Operations (SCOPS) | 28 months | 10 Jan 2024 |
| I-612 | Application for a waiver of the 2-year foreign residence requirement | Service Center Operations (SCOPS) | 2 months | 6 May 2026 |
| I-612 | Application for a waiver of the 2-year foreign residence requirement based on exceptional hardship or persecution | Service Center Operations (SCOPS) | 21.5 months | 24 Aug 2024 |
| I-751 | Removal of lawful permanent resident conditions (spouses of U.S. citizens and lawful permanent residents) | All Field Offices | 36 months | 17 Nov 2021 |
| I-751 | Removal of lawful permanent resident conditions (spouses of U.S. citizens and lawful permanent residents) | Service Center Operations (SCOPS) | 35 months | 31 Jul 2023 |
| I-765 | Alien with Final Order of Deportation Under an OSUP [(c)(18)] | National Benefits Center | 16.5 months | 19 Mar 2025 |
| I-765 | All other applications for employment authorization | National Benefits Center | 10.5 months | 8 Jul 2025 |
| I-765 | All other applications for employment authorization | Service Center Operations (SCOPS) | 16 months | 22 Feb 2025 |
| I-765 | Application for Suspension of Deportation/Sec.244/NACARA/Cancel of Removal [(c)(10)] | National Benefits Center | 10 months | 29 Sep 2024 |
| I-765 | Based on a pending asylum application [(c)(8)] -renewal/replacement | Service Center Operations (SCOPS) | 18.5 months | 12 Dec 2024 |
| I-765 | Based on a pending asylum application [(c)(8)] – Initial Application | Service Center Operations (SCOPS) | 1 month | 26 Aug 2026 |
| I-765 | Based on a pending I-485 adjustment application [(c)(9)] | National Benefits Center | 12 months | 19 May 2025 |
| I-765 | Based on a pending I-485 adjustment application [(c)(9)] | Service Center Operations (SCOPS) | 12.5 months | 30 May 2025 |
| I-765 | Based on a request by a qualified F-1 academic student [(c)(3)] | Service Center Operations (SCOPS) | 5 months | 18 Mar 2026 |
| I-765 | Based on an approved asylum application [(a)(5)] | Service Center Operations (SCOPS) | 2.5 months | 2 May 2025 |
| I-765 | Based on being admitted as a Refugee [(a)(3)] | Service Center Operations (SCOPS) | 18.5 months | 8 Dec 2024 |
| I-765 | Based on being an H-4 spouse of an H-1B nonimmigrant (filed with I-539 H4) [(c)(26)] | Service Center Operations (SCOPS) | 6.5 months | 29 Nov 2025 |
| I-765 | Based on being an H-4 spouse of an H-1B nonimmigrant (Standalone; not filed with I-539 H4) [(c)(26)] | Service Center Operations (SCOPS) | 17.5 months | 23 Feb 2025 |
| I-765 | Based on being an L-2 spouse of an L-1 nonimmigrant [(a)(18)] | Service Center Operations (SCOPS) | 18 months | 26 May 2024 |
| I-765 | Based on parole | National Benefits Center | 13.5 months | 1 Apr 2025 |
| I-765 | Based on TPS for El Salvador [(c)(19), (a)(12)] | Service Center Operations (SCOPS) | 18.5 months | 18 Feb 2025 |
| I-765V | Abused spouse of an A, E-3, G, or H nonimmigrant [(c)(27-30)] | Service Center Operations (SCOPS) | 11.5 months | 16 Oct 2025 |
| I-800 | Petition to Classify Convention Adoptee as an Immediate Relative | National Benefits Center | 3.5 months | 22 Feb 2026 |
| I-800A | Application for Determination of Suitability to Adopt a Child from a Convention Country | National Benefits Center | 4.5 months | 8 Apr 2026 |
| I-800A3 | Request for Action on Approved Form I-800A | National Benefits Center | 2.5 months | 23 May 2026 |
| I-817 | Voluntary departure under the family unity program | National Benefits Center | 6.5 months | 6 Dec 2022 |
| I-817 | Voluntary departure under the family unity program | Service Center Operations (SCOPS) | 6.5 months | 6 Dec 2022 |
| I-821 | El Salvador Initial | Service Center Operations (SCOPS) | 25 months | 23 Oct 2023 |
| I-821 | El Salvador Re-registration | Service Center Operations (SCOPS) | 18.5 months | 20 Feb 2025 |
| I-821 | Somalia Initial | Service Center Operations (SCOPS) | 20 months | 25 Jan 2025 |
| I-821 | Sudan Initial | Service Center Operations (SCOPS) | 7 months | 6 Mar 2026 |
| I-821 | Sudan Re-registration | Service Center Operations (SCOPS) | 17 months | 30 Apr 2025 |
| I-821 | Ukraine Initial | Service Center Operations (SCOPS) | 22.5 months | 17 Aug 2024 |
| I-821 | Ukraine Re-registration | Service Center Operations (SCOPS) | 19 months | 15 Feb 2025 |
| I-821D | Renewal | Service Center Operations (SCOPS) | 7 months | 7 Jun 2026 |
| I-824 | To request further action on an approved application or petition | National Benefits Center | 8 months | 24 Jun 2025 |
| I-824 | To request further action on an approved application or petition | Service Center Operations (SCOPS) | 14.5 months | 16 Dec 2024 |
| I-829 | Removal of lawful permanent resident conditions (immigrant investors) | Immigrant Investor Program Office | 25.5 months | 26 Jul 2020 |
| I-914 | Provides temporary immigration benefits to noncitizen victims of trafficking and their eligible family members | Service Center Operations (SCOPS) | 34 months | 28 Jul 2023 |
| I-918 | Petition for a noncitizen who is a victim of qualifying criminal activity, and their qualifying family members (Time from Initial Filing to Bona Fide Determination (BFD) Review) | Service Center Operations (SCOPS) | 21.5 months | 16 Jun 2024 |
| I-929 | Family member of U nonimmigrant | Service Center Operations (SCOPS) | 32 months | 21 May 2023 |
| I-956 | Application for Regional Center Designation | Immigrant Investor Program Office | 25 months | 9 Jan 2023 |
| I-956F | Application for Approval of an Investment in a Commercial Enterprise | Immigrant Investor Program Office | 11.5 months | 4 Jul 2025 |
| N-400 | Application for Naturalization | Agana GU | 13 months | 16 Mar 2025 |
| N-400 | Application for Naturalization | Albany NY | 10 months | 4 Sep 2025 |
| N-400 | Application for Naturalization | Albuquerque NM | 13 months | 20 Apr 2025 |
| N-400 | Application for Naturalization | Anchorage AK | 12.5 months | 6 Mar 2025 |
| N-400 | Application for Naturalization | Atlanta GA | 13.5 months | 27 Apr 2025 |
| N-400 | Application for Naturalization | Baltimore MD | 15 months | 13 Jan 2025 |
| N-400 | Application for Naturalization | Boise ID | 15 months | 13 Apr 2025 |
| N-400 | Application for Naturalization | Boston MA | 13.5 months | 20 Jun 2025 |
| N-400 | Application for Naturalization | Brooklyn NY | 11 months | 2 Jul 2025 |
| N-400 | Application for Naturalization | Buffalo NY | 14.5 months | 21 Apr 2025 |
| N-400 | Application for Naturalization | Burlington VT | 10.5 months | 24 Sep 2025 |
| N-400 | Application for Naturalization | Charleston SC | 11.5 months | 28 Jun 2025 |
| N-400 | Application for Naturalization | Charlotte Amalie VI | 11.5 months | 4 Jul 2025 |
| N-400 | Application for Naturalization | Charlotte NC | 11 months | 12 Jul 2025 |
| N-400 | Application for Naturalization | Chicago IL | 13 months | 16 Feb 2025 |
| N-400 | Application for Naturalization | Christiansted VI | 11.5 months | 15 Jun 2025 |
| N-400 | Application for Naturalization | Cincinnati OH | 9.5 months | 26 Aug 2025 |
| N-400 | Application for Naturalization | Cleveland OH | 10.5 months | 10 Jul 2025 |
| N-400 | Application for Naturalization | Columbus OH | 10.5 months | 31 Jul 2025 |
| N-400 | Application for Naturalization | Cranbury NJ | 9 months | 26 Sep 2025 |
| N-400 | Application for Naturalization | Dallas TX | 13 months | 19 May 2025 |
| N-400 | Application for Naturalization | Denver CO | 14 months | 30 Mar 2025 |
| N-400 | Application for Naturalization | Des Moines IA | 13.5 months | 11 May 2025 |
| N-400 | Application for Naturalization | Detroit MI | 13 months | 12 May 2025 |
| N-400 | Application for Naturalization | El Paso TX | 13 months | 22 Jun 2025 |
| N-400 | Application for Naturalization | Fort Myers FL | 15.5 months | 17 Feb 2025 |
| N-400 | Application for Naturalization | Fort Smith AR | 11 months | 23 Aug 2025 |
| N-400 | Application for Naturalization | Fresno CA | 15.5 months | 12 Feb 2025 |
| N-400 | Application for Naturalization | Greer SC | 10 months | 18 Aug 2025 |
| N-400 | Application for Naturalization | Harlingen TX | 11.5 months | 30 May 2025 |
| N-400 | Application for Naturalization | Hartford CT | 11.5 months | 26 Jul 2025 |
| N-400 | Application for Naturalization | Helena MT | 9.5 months | 14 Oct 2025 |
| N-400 | Application for Naturalization | Hialeah FL | 9.5 months | 13 Sep 2025 |
| N-400 | Application for Naturalization | Honolulu HI | 12.5 months | 20 May 2025 |
| N-400 | Application for Naturalization | Houston TX | 12 months | 3 Aug 2025 |
| N-400 | Application for Naturalization | Imperial CA | 14.5 months | 1 Apr 2025 |
| N-400 | Application for Naturalization | Indianapolis IN | 14 months | 14 May 2025 |
| N-400 | Application for Naturalization | Jacksonville FL | 15 months | 25 Mar 2025 |
| N-400 | Application for Naturalization | Kansas City MO | 12.5 months | 21 Jun 2025 |
| N-400 | Application for Naturalization | Kendall FL | 10 months | 16 Aug 2025 |
| N-400 | Application for Naturalization | Las Vegas NV | 13 months | 2 Jun 2025 |
| N-400 | Application for Naturalization | Lawrence MA | 18 months | 28 Jan 2025 |
| N-400 | Application for Naturalization | Long Island NY | 12 months | 21 Apr 2025 |
| N-400 | Application for Naturalization | Los Angeles CA | 10.5 months | 22 Jul 2025 |
| N-400 | Application for Naturalization | Los Angeles County CA | 10.5 months | 24 Jul 2025 |
| N-400 | Application for Naturalization | Louisville KY | 10.5 months | 6 Jul 2025 |
| N-400 | Application for Naturalization | Manchester NH | 10.5 months | 17 Aug 2025 |
| N-400 | Application for Naturalization | Memphis TN | 12 months | 3 Jun 2025 |
| N-400 | Application for Naturalization | Miami FL | 10 months | 3 Jul 2025 |
| N-400 | Application for Naturalization | Milwaukee WI | 14 months | 20 Apr 2025 |
| N-400 | Application for Naturalization | Minneapolis-St. Paul MN | 14.5 months | 2 Feb 2025 |
| N-400 | Application for Naturalization | Montgomery AL | 9.5 months | 27 Sep 2025 |
| N-400 | Application for Naturalization | Mount Laurel NJ | 10 months | 17 Jul 2025 |
| N-400 | Application for Naturalization | Nashville TN | 13 months | 27 Apr 2025 |
| N-400 | Application for Naturalization | New Orleans LA | 12.5 months | 3 May 2025 |
| N-400 | Application for Naturalization | New York City NY | 10 months | 6 Sep 2025 |
| N-400 | Application for Naturalization | Newark NJ | 11.5 months | 14 Jun 2025 |
| N-400 | Application for Naturalization | Norfolk VA | 10.5 months | 9 Aug 2025 |
| N-400 | Application for Naturalization | Oakland Park FL | 12.5 months | 6 Mar 2025 |
| N-400 | Application for Naturalization | Oklahoma City OK | 13 months | 12 Jun 2025 |
| N-400 | Application for Naturalization | Omaha NE | 12.5 months | 16 Jul 2025 |
| N-400 | Application for Naturalization | Orlando FL | 13.5 months | 6 Mar 2025 |
| N-400 | Application for Naturalization | Philadelphia PA | 11.5 months | 30 Jun 2025 |
| N-400 | Application for Naturalization | Phoenix AZ | 12 months | 21 Aug 2025 |
| N-400 | Application for Naturalization | Pittsburgh PA | 11.5 months | 6 Jul 2025 |
| N-400 | Application for Naturalization | Portland ME | 14.5 months | 24 Feb 2025 |
| N-400 | Application for Naturalization | Portland OR | 14.5 months | 14 Apr 2025 |
| N-400 | Application for Naturalization | Providence RI | 10 months | 21 Aug 2025 |
| N-400 | Application for Naturalization | Queens NY | 10.5 months | 7 Jun 2025 |
| N-400 | Application for Naturalization | Raleigh NC | 12 months | 5 Jun 2025 |
| N-400 | Application for Naturalization | Reno NV | 11.5 months | 4 Jul 2025 |
| N-400 | Application for Naturalization | Sacramento CA | 16 months | 26 Sep 2024 |
| N-400 | Application for Naturalization | Saint Louis MO | 12.5 months | 2 Aug 2025 |
| N-400 | Application for Naturalization | Salt Lake City UT | 13.5 months | 22 May 2025 |
| N-400 | Application for Naturalization | San Antonio TX | 11.5 months | 18 Aug 2025 |
| N-400 | Application for Naturalization | San Bernardino CA | 13 months | 20 Apr 2025 |
| N-400 | Application for Naturalization | San Diego CA | 15.5 months | 24 Oct 2024 |
| N-400 | Application for Naturalization | San Fernando Valley CA | 13 months | 8 Jun 2025 |
| N-400 | Application for Naturalization | San Francisco CA | 14.5 months | 12 Nov 2024 |
| N-400 | Application for Naturalization | San Jose CA | 16 months | 7 Feb 2024 |
| N-400 | Application for Naturalization | San Juan PR | 9.5 months | 27 Oct 2025 |
| N-400 | Application for Naturalization | Santa Ana CA | 14 months | 2 May 2025 |
| N-400 | Application for Naturalization | Seattle WA | 13.5 months | 12 Jun 2025 |
| N-400 | Application for Naturalization | Spokane WA | 11.5 months | 2 Sep 2025 |
| N-400 | Application for Naturalization | Tampa FL | 13.5 months | 9 May 2025 |
| N-400 | Application for Naturalization | Tucson AZ | 12 months | 31 Jul 2025 |
| N-400 | Application for Naturalization | Washington DC | 11.5 months | 21 Jul 2025 |
| N-400 | Application for Naturalization | West Palm Beach FL | 10 months | 14 May 2025 |
| N-400 | Application for Naturalization | Wichita KS | 13 months | 1 Apr 2025 |
| N-400 | Application for Naturalization | Yakima WA | 13.5 months | 20 Jun 2025 |
| N-565 | U.S. citizen applying for a replacement of naturalization or citizenship certificate | Service Center Operations (SCOPS) | 8.5 months | 20 Nov 2025 |
| N-600 | Application for recognition of U.S. citizenship | Agana GU | 12 months | 26 Jan 2025 |
| N-600 | Application for recognition of U.S. citizenship | Albany NY | 20 months | 6 Jun 2024 |
| N-600 | Application for recognition of U.S. citizenship | Albuquerque NM | 11 months | 25 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | Anchorage AK | 9 months | 15 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Atlanta GA | 6 months | 6 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Baltimore MD | 12 months | 8 Jun 2025 |
| N-600 | Application for recognition of U.S. citizenship | Boise ID | 7.5 months | 27 Jan 2026 |
| N-600 | Application for recognition of U.S. citizenship | Boston MA | 14 months | 23 Aug 2024 |
| N-600 | Application for recognition of U.S. citizenship | Brooklyn NY | 10.5 months | 28 Jul 2025 |
| N-600 | Application for recognition of U.S. citizenship | Buffalo NY | 11.5 months | 17 Aug 2025 |
| N-600 | Application for recognition of U.S. citizenship | Burlington VT | 10.5 months | 21 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Charleston SC | 7 months | 15 Dec 2025 |
| N-600 | Application for recognition of U.S. citizenship | Charlotte Amalie VI | 3 months | 23 May 2026 |
| N-600 | Application for recognition of U.S. citizenship | Charlotte NC | 12.5 months | 2 Feb 2025 |
| N-600 | Application for recognition of U.S. citizenship | Chicago IL | 11 months | 7 Jun 2025 |
| N-600 | Application for recognition of U.S. citizenship | Christiansted VI | 4 months | 23 May 2026 |
| N-600 | Application for recognition of U.S. citizenship | Cincinnati OH | 4 months | 10 Feb 2026 |
| N-600 | Application for recognition of U.S. citizenship | Cleveland OH | 18.5 months | 26 Jan 2025 |
| N-600 | Application for recognition of U.S. citizenship | Columbus OH | 4 months | 7 Jan 2026 |
| N-600 | Application for recognition of U.S. citizenship | Cranbury NJ | 6 months | 17 Jan 2026 |
| N-600 | Application for recognition of U.S. citizenship | Dallas TX | 8.5 months | 26 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Denver CO | 13.5 months | 6 Apr 2025 |
| N-600 | Application for recognition of U.S. citizenship | Des Moines IA | 12 months | 26 May 2025 |
| N-600 | Application for recognition of U.S. citizenship | Detroit MI | 10.5 months | 17 Oct 2024 |
| N-600 | Application for recognition of U.S. citizenship | El Paso TX | 25.5 months | 22 Mar 2024 |
| N-600 | Application for recognition of U.S. citizenship | Fort Myers FL | 10.5 months | 19 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | Fort Smith AR | 5 months | 12 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Fresno CA | 11 months | 27 Aug 2025 |
| N-600 | Application for recognition of U.S. citizenship | Greer SC | 6.5 months | 27 Jan 2026 |
| N-600 | Application for recognition of U.S. citizenship | Harlingen TX | 11.5 months | 28 Dec 2024 |
| N-600 | Application for recognition of U.S. citizenship | Hartford CT | 7 months | 4 Dec 2025 |
| N-600 | Application for recognition of U.S. citizenship | Helena MT | 12 months | 25 May 2025 |
| N-600 | Application for recognition of U.S. citizenship | Hialeah FL | 7 months | 9 Dec 2025 |
| N-600 | Application for recognition of U.S. citizenship | Honolulu HI | 11.5 months | 29 Mar 2025 |
| N-600 | Application for recognition of U.S. citizenship | Houston TX | 10.5 months | 13 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | Imperial CA | 10.5 months | 29 Jun 2025 |
| N-600 | Application for recognition of U.S. citizenship | Indianapolis IN | 6.5 months | 9 Nov 2025 |
| N-600 | Application for recognition of U.S. citizenship | Jacksonville FL | 12.5 months | 18 Jun 2025 |
| N-600 | Application for recognition of U.S. citizenship | Kansas City MO | 14.5 months | 22 Oct 2024 |
| N-600 | Application for recognition of U.S. citizenship | Kendall FL | 8 months | 19 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Las Vegas NV | 9.5 months | 17 Dec 2025 |
| N-600 | Application for recognition of U.S. citizenship | Lawrence MA | 7.5 months | 15 Nov 2025 |
| N-600 | Application for recognition of U.S. citizenship | Long Island NY | 10 months | 25 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Los Angeles CA | 9.5 months | 14 Jul 2025 |
| N-600 | Application for recognition of U.S. citizenship | Los Angeles County CA | 9 months | 29 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Louisville KY | 8 months | 31 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Manchester NH | 5 months | 1 Mar 2026 |
| N-600 | Application for recognition of U.S. citizenship | Memphis TN | 15.5 months | 21 May 2022 |
| N-600 | Application for recognition of U.S. citizenship | Miami FL | 11.5 months | 13 Jul 2025 |
| N-600 | Application for recognition of U.S. citizenship | Milwaukee WI | 15.5 months | 8 Jul 2024 |
| N-600 | Application for recognition of U.S. citizenship | Minneapolis-St. Paul MN | 22 months | 3 Apr 2024 |
| N-600 | Application for recognition of U.S. citizenship | Montgomery AL | 10.5 months | 29 Aug 2025 |
| N-600 | Application for recognition of U.S. citizenship | Mount Laurel NJ | 10.5 months | 10 May 2025 |
| N-600 | Application for recognition of U.S. citizenship | Nashville TN | 10 months | 12 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | New Orleans LA | 10 months | 24 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | New York City NY | 7.5 months | 20 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | Newark NJ | 7.5 months | 8 Dec 2025 |
| N-600 | Application for recognition of U.S. citizenship | Norfolk VA | 10 months | 30 Jul 2025 |
| N-600 | Application for recognition of U.S. citizenship | Oakland Park FL | 8.5 months | 6 Jul 2025 |
| N-600 | Application for recognition of U.S. citizenship | Oklahoma City OK | 10.5 months | 15 May 2025 |
| N-600 | Application for recognition of U.S. citizenship | Omaha NE | 9.5 months | 13 Nov 2023 |
| N-600 | Application for recognition of U.S. citizenship | Orlando FL | 14.5 months | 2 Mar 2025 |
| N-600 | Application for recognition of U.S. citizenship | Philadelphia PA | 8.5 months | 9 Nov 2025 |
| N-600 | Application for recognition of U.S. citizenship | Phoenix AZ | 10 months | 28 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | Pittsburgh PA | 10 months | 14 Aug 2025 |
| N-600 | Application for recognition of U.S. citizenship | Portland ME | 6 months | 29 Mar 2025 |
| N-600 | Application for recognition of U.S. citizenship | Portland OR | 6 months | 18 Dec 2025 |
| N-600 | Application for recognition of U.S. citizenship | Providence RI | 4 months | 8 Mar 2026 |
| N-600 | Application for recognition of U.S. citizenship | Queens NY | 7.5 months | 30 Nov 2025 |
| N-600 | Application for recognition of U.S. citizenship | Raleigh NC | 12.5 months | 25 Jan 2024 |
| N-600 | Application for recognition of U.S. citizenship | Reno NV | 17 months | 21 Apr 2025 |
| N-600 | Application for recognition of U.S. citizenship | Sacramento CA | 9.5 months | 1 Nov 2024 |
| N-600 | Application for recognition of U.S. citizenship | Saint Louis MO | 12 months | 4 Mar 2025 |
| N-600 | Application for recognition of U.S. citizenship | Salt Lake City UT | 14.5 months | 5 Dec 2024 |
| N-600 | Application for recognition of U.S. citizenship | San Antonio TX | 10 months | 5 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | San Bernardino CA | 11 months | 19 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | San Diego CA | 14 months | 22 Aug 2024 |
| N-600 | Application for recognition of U.S. citizenship | San Fernando Valley CA | 4.5 months | 26 Nov 2025 |
| N-600 | Application for recognition of U.S. citizenship | San Francisco CA | 13 months | 10 Apr 2025 |
| N-600 | Application for recognition of U.S. citizenship | San Jose CA | 9 months | 21 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | San Juan PR | 10.5 months | 18 Aug 2025 |
| N-600 | Application for recognition of U.S. citizenship | Santa Ana CA | 12 months | 3 Aug 2025 |
| N-600 | Application for recognition of U.S. citizenship | Seattle WA | 14 months | 31 Jan 2025 |
| N-600 | Application for recognition of U.S. citizenship | Spokane WA | 13.5 months | 13 Jun 2025 |
| N-600 | Application for recognition of U.S. citizenship | Tampa FL | 9 months | 21 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Tucson AZ | 10.5 months | 16 Sep 2025 |
| N-600 | Application for recognition of U.S. citizenship | Washington DC | 11 months | 26 Apr 2025 |
| N-600 | Application for recognition of U.S. citizenship | West Palm Beach FL | 13 months | 18 Jun 2025 |
| N-600 | Application for recognition of U.S. citizenship | Wichita KS | 10.5 months | 14 Oct 2025 |
| N-600 | Application for recognition of U.S. citizenship | Yakima WA | 9.5 months | 21 Aug 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Agana GU | 17.5 months | 6 Feb 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Albany NY | 11.5 months | 13 Jun 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Albuquerque NM | 11 months | 22 Oct 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Anchorage AK | 16.5 months | 14 May 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Atlanta GA | 10.5 months | 19 May 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Baltimore MD | 16 months | 6 May 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Boise ID | 14 months | 29 Apr 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Boston MA | 20.5 months | 11 Nov 2023 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Brooklyn NY | 18.5 months | 14 Apr 2021 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Buffalo NY | 10 months | 18 Mar 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Burlington VT | 9 months | 6 May 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Charleston SC | 7.5 months | 15 Feb 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Charlotte Amalie VI | 14 months | 29 Apr 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Charlotte NC | 11.5 months | 30 Oct 2022 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Chicago IL | 41.5 months | 1 Nov 2021 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Christiansted VI | 14 months | 29 Apr 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Cincinnati OH | 11.5 months | 25 Nov 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Cleveland OH | 12 months | 30 Sep 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Columbus OH | 6.5 months | 14 Mar 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Cranbury NJ | 17 months | 24 Feb 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Dallas TX | 27.5 months | 13 Jun 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Denver CO | 8.5 months | 12 Oct 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Des Moines IA | 14.5 months | 6 Jul 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Detroit MI | 21.5 months | 26 Aug 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | El Paso TX | 6.5 months | 3 Mar 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Fort Myers FL | 18.5 months | 13 Mar 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Fort Smith AR | 5 months | 23 Apr 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Fresno CA | 6.5 months | 3 Aug 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Greer SC | 7 months | 18 Nov 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Harlingen TX | 13 months | 13 Dec 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Hartford CT | 12 months | 10 Jun 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Helena MT | 6 months | 13 Mar 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Hialeah FL | 5 months | 3 May 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Honolulu HI | 20 months | 29 Jan 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Houston TX | 10 months | 23 Nov 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Imperial CA | 14 months | 29 Apr 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Indianapolis IN | 36 months | 25 Jun 2022 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Jacksonville FL | 17 months | 24 Apr 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Kansas City MO | 3.5 months | 23 May 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Kendall FL | 12 months | 10 Mar 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Las Vegas NV | 25.5 months | 26 Jul 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Lawrence MA | 22.5 months | 6 Mar 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Long Island NY | 13.5 months | 28 Apr 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Los Angeles CA | 13 months | 11 Aug 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Los Angeles County CA | 18.5 months | 7 Mar 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Louisville KY | 9 months | 27 Oct 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Manchester NH | 11.5 months | 5 May 2023 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Memphis TN | 65 months | 5 May 2021 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Miami FL | 20.5 months | 20 Mar 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Milwaukee WI | 32.5 months | 10 Jan 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Minneapolis-St. Paul MN | 13 months | 4 Sep 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Montgomery AL | 45.5 months | 18 Dec 2022 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Mount Laurel NJ | 10 months | 7 Apr 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Nashville TN | 14 months | 29 Apr 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | New Orleans LA | 2 months | 23 May 2026 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | New York City NY | 38.5 months | 3 Dec 2021 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Newark NJ | 8 months | 18 Oct 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Norfolk VA | 12 months | 10 May 2023 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Oakland Park FL | 17.5 months | 20 Sep 2022 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Oklahoma City OK | 14 months | 29 Apr 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Omaha NE | 10.5 months | 9 Nov 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Orlando FL | 58 months | 17 Jun 2021 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Philadelphia PA | 12.5 months | 19 Dec 2023 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Phoenix AZ | 11.5 months | 12 Nov 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Pittsburgh PA | 12.5 months | 1 Apr 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Portland ME | 18.5 months | 21 Jul 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Portland OR | 29.5 months | 16 Feb 2020 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Providence RI | 21 months | 4 Jan 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Queens NY | 9 months | 27 Aug 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Raleigh NC | 9 months | 30 Dec 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Reno NV | 14 months | 29 Apr 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Sacramento CA | 48.5 months | 10 Mar 2021 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Saint Louis MO | 65 months | 1 May 2021 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Salt Lake City UT | 9 months | 25 Dec 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | San Antonio TX | 26.5 months | 24 Feb 2023 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | San Bernardino CA | 9.5 months | 16 Dec 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | San Diego CA | 29 months | 19 Nov 2023 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | San Fernando Valley CA | 8.5 months | 10 Mar 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | San Francisco CA | 20.5 months | 4 Nov 2022 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | San Jose CA | 12.5 months | 22 Apr 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | San Juan PR | 10 months | 25 Feb 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Santa Ana CA | 17 months | 19 Apr 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Seattle WA | 22.5 months | 18 Aug 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Spokane WA | 10 months | 20 Oct 2024 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Tampa FL | 9.5 months | 24 Nov 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Tucson AZ | 13 months | 21 Aug 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Washington DC | 25.5 months | 2 Aug 2023 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | West Palm Beach FL | 7.5 months | 12 Sep 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Wichita KS | 11.5 months | 20 Oct 2025 |
| N-600K | Application for Citizenship and Issuance of Certificate Under Section 322 | Yakima WA | 9.5 months | 2 Sep 2025 |
Sources and limits
Read 2026-09-20 from the USCIS processing times tool, 493 form, case type and office combinations. USCIS computes the 80% figure from cases completed in the previous six months, so a queue that is speeding up or slowing down shows here with a lag. The inquiry date is USCIS's own threshold and moves daily; the tool linked above is the authority on the day you file. Field office figures apply to interviews scheduled there; a case transferred between offices takes the new office's number. Whether a green card case is even eligible to be decided depends first on the Visa Bulletin.